[{"data":1,"prerenderedAt":49},["ShallowReactive",2],{"article-en-how-to-perform-quality-verification-of-outsourced-software":3},{"article":4,"related":18,"prevArticle":38,"nextArticle":42,"availableLocales":46},{"id":5,"slug":5,"title":6,"excerpt":7,"content":8,"image":9,"date":10,"published":11,"status":12,"category":13,"keywords":14,"meta_description":15,"og_image":16,"custom_css":16,"created_at":10,"updated_at":17},"how-to-perform-quality-verification-of-outsourced-software","You paid an outsourcing team a lot for your system. How do you avoid paying again for changes?","Risk management for outsourced software development, from requirements analysis and system design to acceptance testing, with a practical approach to quality verification that helps companies avoid extra costs later.","\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-cb245efbb49b903e15e58d5f3952e928\" style=\"font-size:16px\">\u003Cstrong>TLDR\u003C/strong>\u003Cbr>\u003Cbr>The short answer: this is a hard problem to solve, because it comes from how software is built and how its costs are structured, and the client has little control over either. Of course, if nothing could be done, there would be no point in writing this article. Avoiding changes entirely is unlikely, but we can talk about how to reduce the risk.\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-667768c604574bcef43997375af24496\" style=\"font-size:16px\">As software development consultants, we often meet clients who have already spent a large budget on an outsourcing team, only to get stuck in a swamp of requirement changes halfway through the project. Every change needs more budget, and the schedule keeps slipping. Both sides feel they are in the right: the client sees these as \"small changes\", while the development team says every change affects the existing architecture.\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-53cb16c56d9481230f7401e899d5d014\" style=\"font-size:16px\">\u003Cstrong>So where does the problem actually come from?\u003C/strong>\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-9fc0826a19f3b8b42099b708f0cae195\" style=\"font-size:16px\">After years of advising clients, I have found that the root cause is usually not communication skills or project management methods. It is a lack of structured thinking when the requirements are being defined. Many companies, before outsourcing development, do not know which of their requirements are core and should not change easily, and which can stay flexible. Without that, they cannot make sensible arrangements when the contract and specifications are drawn up.\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-64283a36be57c3da2c222f904bcb73e1\" style=\"font-size:16px\">Below, I start from a real case I worked on to show how analysing the structure of requirements helps a company control risk when it outsources a system.\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cblockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n\t\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-d98d341cc2e97289b76e6bf800460a33\" style=\"font-size:18px\">\u003Cem>A manufacturing company wanted a production scheduling system. The requirement looked simple: sequence the work orders on the production lines, taking into account delivery dates, material preparation time and similar factors. The company extracted the basic rules from the Excel sheets it had been using, and the outsourcing team built the first version of the system based on them.\u003C/em>\u003C/p>\n\t\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-624006eb0c077d5644eaecd9ff2ecaa3\" style=\"font-size:18px\">\u003Cem>Less than a month after launch, the sales department asked for something new: scheduling should allow for \"rush orders\" to be inserted. This reasonable-sounding \"small change\" actually touched the core logic of the system. The original scheduling rules were built on fixed capacity planning. Supporting dynamic adjustment meant changing not only the data structures, but also several modules, including capacity calculation and material requirements calculation.\u003C/em>\u003C/p>\n\u003C/blockquote>\n\u003Cfigure>\n\t\u003Cimg src=\"https://cdn.sqa.tw/blog_pictures/discord_between_customer_and_dev_team.png\" alt=\"Discord from different perspectives\">\n\t\u003Cfigcaption>Discord from different perspectives\u003C/figcaption>\n\u003C/figure>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-93dd5374e31edd66517b2e8ed215349f\" style=\"font-size:16px\">This case shows a common problem: business requirements tend to \"extend\". A requirement raised today usually implies changes that may come later. In this case, \"rush orders\" reflected a more fundamental issue: the company needed to balance \"production efficiency\" against \"order flexibility\". That balance point keeps shifting with market conditions, so the system architecture should have allowed for such adjustments from the start.\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-eb9a7df9f586507d355dec598326a82a\" style=\"font-size:16px\">This is why I always advise clients to do a \"structured\" analysis when they define requirements.\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-f6339d7772276f909f343e6764c757c8\" style=\"font-size:16px\">A structured analysis of requirements looks at three dimensions:\u003C/p>\n\u003Ch5 class=\"wp-block-heading\">Core business principles\u003C/h5>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-849e748d96b22887d0b458613a175f00\" style=\"font-size:16px\">This is the lowest and most stable layer, usually tied to the basic logic of how the business operates\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-e6ca4973798b2793daecc093390e967c\" style=\"font-size:16px\">Changing this layer costs the most, because it affects the whole system architecture\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-567de66108fc58864c2fa59cb8a354f4\" style=\"font-size:16px\">It must be settled early in system design\u003C/li>\n\u003C/ul>\n\u003Ch5 class=\"wp-block-heading\">Operating rules\u003C/h5>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-b5eec23e839e3bb4d89df27aae909b18\" style=\"font-size:16px\">This layer defines how the business principles are carried out\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-37733a94c02c6a4fddf5f6fc2bf9c77f\" style=\"font-size:16px\">There is some room for adjustment, but changes should stay within reasonable limits\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-756fc9312717c45945742bfe95fc3650\" style=\"font-size:16px\">The system design needs to leave room for flexibility here\u003C/li>\n\u003C/ul>\n\u003Ch5 class=\"wp-block-heading\">Runtime variables\u003C/h5>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-7db2f5224ca4cc8c733a1b3a62fc123b\" style=\"font-size:16px\">This is the outermost layer and the one most likely to change\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-cc5b4cede2843c285fb3d274d93c0d86\" style=\"font-size:16px\">It can usually be adjusted through settings or simple code changes\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-0b7329371e2433c46da5350bf30838f9\" style=\"font-size:16px\">The system should provide a complete settings interface\u003C/li>\n\u003C/ul>\n\u003Chr class=\"wp-block-separator has-alpha-channel-opacity\">\n\u003Cfigure>\n\t\u003Cimg src=\"https://cdn.sqa.tw/blog_pictures/level_of_system_parameters_rules.png\" alt=\"Three Dimensions of Domain\">\n\t\u003Cfigcaption>Looking at system requirements from different layers and angles\u003C/figcaption>\n\u003C/figure>\n\u003Cp>\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-707149f5ba5e7636c6ac4e0534b46fa8\" style=\"font-size:16px\">Let's apply this to the production scheduling system:\u003C/p>\n\u003Ch6 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-0462ae8d7405f20a3a11c8bc988561ac\" style=\"font-size:18px\">\u003Cstrong>Core business principles:\u003C/strong>\u003C/h6>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-24086da10bce234191ebc880b44a9856\" style=\"font-size:16px\">Capacity is a limited resource and must be allocated sensibly\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-954c60b8f6884ad6b4d742793719290a\" style=\"font-size:16px\">Orders must be completed before their delivery date\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-ccae5b6d65e924c287a04c7162207f4f\" style=\"font-size:16px\">Material requirements must be calculated accurately\u003C/li>\n\u003C/ul>\n\u003Ch6 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-ad8f77ae6b02d42c105e301710b8d8f9\" style=\"font-size:18px\">\u003Cstrong>Operating rules:\u003C/strong>\u003C/h6>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-e44f24309853ed28a17b8009e26e0b5b\" style=\"font-size:16px\">Scheduling priority rules\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-4945f0d794e2809b4b585390d3db1b2e\" style=\"font-size:16px\">How capacity is calculated\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-6b794196580d1956188b945f2c39d8c3\" style=\"font-size:16px\">The logic for calculating material requirements\u003C/li>\n\u003C/ul>\n\u003Ch6 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-5bd6d7773b7802f87a940617b1b49692\" style=\"font-size:18px\">\u003Cstrong>Runtime parameters:\u003C/strong>\u003C/h6>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-d4a779759814148c8e796a7abf0305e9\" style=\"font-size:16px\">Standard capacity of each production line\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-accb7bb3d7fdb835d9e57172ec535a62\" style=\"font-size:16px\">Standard hours for each process step\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-2a65b08d44860ed878ee79672e6a1b85\" style=\"font-size:16px\">Safety stock levels\u003C/li>\n\u003C/ul>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-e8e36d8dccf97a856ef97be2069ec489\" style=\"font-size:16px\">Seen this way, the \"rush order\" requirement is much more than adding one feature. It challenges the original core principle that \"capacity is a fixed resource\" and replaces it with \"capacity is a resource that can be adjusted dynamically\". A change to a core principle naturally ripples into the calculation logic in the operating rules layer.\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-711f59f1e104fa8baeaadf417808bc81\" style=\"font-size:16px\">So how do you spot requirements like this, the ones that can have a large impact, early on? In years of consulting, I have seen one pattern again and again: companies tend to assume their own way of working is \"the industry standard\". When a company asks to \"support rush orders\", it often assumes this is a standard feature that \"everyone in the industry has\".\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-de32578af12ea4bf17ba7aef779e12ec\" style=\"font-size:16px\">In reality, every company defines and handles \"rush orders\" differently:\u003C/p>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-16c01027958e4b4ae690e05797299fed\" style=\"font-size:16px\">Some reserve capacity for them\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-c5382be31eedf974caa8017d52c9bc6d\" style=\"font-size:16px\">Some move the delivery dates of other orders\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-7b029e356183289cae5f2a6305d8f9ab\" style=\"font-size:16px\">Some make up the difference with overtime or subcontracting\u003C/li>\n\u003C/ul>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-d4468f5801b587003ca8367a6fb8e529\" style=\"font-size:16px\">To identify these special requirements early in the project, I suggest looking from three angles:\u003C/p>\n\u003Ch5 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-f418916ff25dd05621501288ce127c63\">Compare with off-the-shelf solutions\u003C/h5>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-dfebd9afc0379c166b945b1846f91737\" style=\"font-size:18px\">Can packaged software on the market fully meet the requirements?\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-a2469b32b35a7661406c44c91a11d6e6\" style=\"font-size:18px\">Is the part that would need modifying too large?\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-89504564193e055e97cfa2459be0eed1\" style=\"font-size:18px\">If you find you need heavy customisation, those requirements are very likely ways of working specific to your company\u003C/li>\n\u003C/ul>\n\u003Ch5 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-517a3d1637d2b6bd7f8b8bcb7912fbc5\">Check how the problem is described\u003C/h5>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-2c862127b8711d438443d55fe2a83579\" style=\"font-size:16px\">Can the requirement be described clearly as a complete process?\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-1d4a390e07d2cb10a457d17e639aa096\" style=\"font-size:16px\">Do different departments understand the same process the same way?\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-88d49760c17d0cef5aa5d4dee36f9ada\" style=\"font-size:16px\">If even the people asking for it struggle to explain it, or departments read it differently, those areas need closer clarification\u003C/li>\n\u003C/ul>\n\u003Ch5 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-be643034f9186a8a4c3126932fd462a6\">Look at exception handling\u003C/h5>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-6c35d6f4457af80f49445c11029b5c8c\" style=\"font-size:16px\">What special situations exist outside the normal process?\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-4cafdaa0e05096f35096b2454e4d4555\" style=\"font-size:16px\">How often do these situations happen?\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-fb50359d7f7437ccc4b549058dd866f7\" style=\"font-size:16px\">Exception handling often reveals a company's special requirements\u003C/li>\n\u003C/ul>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-cb941b559c9ab9557e9f5b5613739b68\" style=\"font-size:16px\">\u003Cem>Take an e-commerce system as an example. The client said: \"The quoting feature is simple. It just calculates the unit price from the quantity.\" Digging deeper, we found that:\u003C/em>\u003C/p>\n\u003Cul class=\"wp-block-list\">\n\t\u003Cli>\u003Cem>Different customer tiers get different kinds of discounts\u003C/em>\u003C/li>\n\t\u003Cli>\u003Cem>Some products can have special promotion rules\u003C/em>\u003C/li>\n\t\u003Cli>\u003Cem>Sales staff can adjust prices under certain conditions\u003C/em>\u003C/li>\n\t\u003Cli>\u003Cem>Some products are priced using live exchange rates\u003C/em>\u003C/li>\n\u003C/ul>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-2fd587c3e4bd141137953e25e7ddd666\" style=\"font-size:16px\">On the surface it was a simple quoting feature, but underneath it held a lot of business logic specific to the company. That logic has to be identified early in system design so the right architecture can be planned.\u003C/p>\n\u003Cfigure>\n\t\u003Cimg src=\"https://cdn.sqa.tw/blog_pictures/the_way_to_accomplish_the_goal.jpeg\" alt=\"The way to build the system\">\n\t\u003Cfigcaption>The road ahead may not be so smooth\u003C/figcaption>\n\u003C/figure>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-cc8fd7b6f233acd2cd5e4416de4a75ca\" style=\"font-size:16px\">With this kind of analysis, we can tell more clearly at the start of a project which requirements are core needs the system must support, and which are flexible needs that may change. Knowing this lets us:\u003C/p>\n\u003Col class=\"wp-block-list\">\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-c18de76a7e4d699c15cf71867dad9f79\" style=\"font-size:18px\">Plan the system's flexibility boundaries from the start\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-e6ed35e97e5b790176a8a25b66368603\" style=\"font-size:18px\">Separate out the parts that genuinely need customisation\u003C/li>\n\t\u003Cli class=\"has-black-color has-text-color has-link-color wp-elements-df2951b3c3648cca414ddf90abbbec40\" style=\"font-size:18px\">Avoid over-engineering that adds unnecessary cost\u003C/li>\n\u003C/ol>\n\u003Cp>\u003C/p>\n\u003Cp>\u003C/p>\n\u003Cp class=\"has-black-color has-text-color has-link-color wp-elements-2e86582d4e6c3095561253a4bbcb1db0\" style=\"font-size:16px\">One last point: the cost of building a system is usually not in the initial development but in the modifications that follow. With better requirements analysis, we can make sure every dollar goes to features that genuinely need customising, rather than to repeatedly reworking parts that should have been flexible in the first place.\u003C/p>\n\u003Cp>\u003C/p>","https://cdn.sqa.tw/blog_pictures/software-outsource-quality-verification.jpg","2024-10-09T00:00:00+00:00",true,"published","sqa","outsourced software development, quality verification, software testing, requirements management, project management, outsourcing management","How to manage the risk of outsourced software development, from requirements analysis to acceptance testing, so your company avoids paying again for changes.",null,"2025-07-01T12:15:41.99459+00:00",[19,26,32],{"id":20,"slug":20,"title":21,"excerpt":22,"image":23,"date":24,"category":25},"ai-development-sdlc-release-verification","When AI builds it in two hours but verification still takes three days","Once AI speeds up development, spec sign-off, testing and release do not automatically speed up with it. Using a real case from a booking system SaaS, we describe how we adjusted the SDLC to cut full release verification from two or three days to under two hours, and how the SQA role changed along the way.","https://cdn.sqa.tw/articles/ai-sdlc-verification-bottleneck-cover.jpg","2026-11-05T12:00:00+08:00","perspective",{"id":27,"slug":27,"title":28,"excerpt":29,"image":30,"date":31,"category":25},"sme-guide-to-choosing-ai-agent","AI agents are everywhere. How should a small business choose one?","We were recently asked to run a full post-deployment review of an AI agent, and found it had quietly caused five times too much raw material to be ordered from customer order emails, and nearly created a liquidity risk on the finance side. The problem with agents is rarely that they are not smart enough. It is that nobody asked the right questions.","https://cdn.sqa.tw/articles/sme-agent-black-box-inspection.jpg","2026-09-01T15:00:00+00:00",{"id":33,"slug":33,"title":34,"excerpt":35,"image":36,"date":37,"category":25},"ai-coding-team-collaboration-three-patterns","Three patterns we see once AI coding reaches the team","After working with more than ten development teams over the past six months, we keep seeing the same thing: individuals getting faster with AI does not mean the team is ready to get faster together.","/images/blog/ai-coding-teams-editorial.jpg","2026-08-20T08:00:00+00:00",{"slug":39,"title":40,"date":41},"sqa-vs-automation","SQA engineer or test automation engineer, which should you hire?","2024-09-25T00:00:00+00:00",{"slug":43,"title":44,"date":45},"why-cant-the-problem-always-be-detected","Why does testing keep missing the problems?","2024-12-05T00:00:00+00:00",[47,48],"en","zh",1794970113652]